Sunday 8 December 2013

OPERATION WOODWORK AND CARPENTRY
















Preparing to sand floor

As you can see the shower toilet is built and all the roof beams are in place which i  notched and then screwed into the roof beams. The floor is very dirty and looks like its has not been sanded for years under there is antique oregan pine somewhere =). At the back you can see the library taking shape
LIBRARY AND BURNER


ROOF BEAMS AND EXPANING FOAM IN ROOF SPACE

i need to make the roof secure as all the cladding would be heavy and also needed to be flexible. Like I said  the roof beams are notched and then i used self tapping screws to attach them to roof beams.

BELT SANDING

The floor was belt sanded you can see the true colour coming through the pictue shows the true size available especially for a 3.5 ton van.



The oregan pine which has a slight orange colour to it is looking like new and you can see at the top we have started treating it with danish oil also the top of the library has been treated and you can see how it brings it out.


The floor has been sanded and treated with 3 coats of danish oil we were lucky to have  antique oregan pine flooring =)


As you can see we had to add new wooden slats to attach cladding and we also removed cupboard.

.